Tribune Des Moines, Iowa USO Center For WAACs Remodeling? Slated at I.O.O.F. Ipuilding. The second and third floors of the I.O.O.F. building, 615 Locust St., will be remodeled at a cost of $15,000 into a USO recreation center for the WAACs. Plans are virtually completed, and work is expected to begin soon. The second floor will include a social room, 46 by 32 feet, a game room, 44 by 32 feet, a lounge, book nook, powder room, kitchen, checkroom, two offices and a canteen or snack bar. The third floor will contain an all purpose room, 40 by 32 feet, two clubrooms, dressing room, kitchen and showers.